Stamped concrete patio with a gazebo

Patios & Pool Decks · Joliet & Chicagoland

Patios made for summer evenings.

New patios and pool decks for homes across Joliet and Chicagoland, sloped away from the house and finished to your style. One crew from excavation to the final finish.

Covers
Patios · Pool decks
Finish
Broom or stamped
Permit
Joliet requires one for patios, with or without a roof, plus a plat of survey.

What's included

The space between the house and the yard.

Backyard concrete planned around how you use it.

Patios

New patios and full replacements, sized for the table, the grill, and the people around them.

Pool decks

The concrete around your pool, planned with the pool's edge and the barrier in mind.

Finish

Start with the look.

Every patio starts on the same base. The finish is where it becomes yours.

Illustrative example: broom finish concrete drivewayIllustrative

Broom finish

Clean, textured, and slip-resistant. The classic patio surface.

How we build it

Six stages. One crew.

A patio lives or dies by what happens to water. Here's how it's built to move it.

  1. 01

    Excavate & grade

    Dug to depth and shaped so water runs away from the house.

    Area excavated down to bare soilIllustrative
  2. 02

    Compacted base

    Soft spots come out; compacted gravel goes in for an even bed.

    Compacted gravel base graded levelIllustrative
  3. 03

    Forms & isolation joints

    Forms set the shape. Isolation joints separate the new slab from the garage, walks, and existing paving so each can move on its own.

    Wood forms staked around the baseIllustrative
  4. 04

    Reinforcement & control joints

    Reinforcement adds strength, and control joints are planned before the pour.

    Forms with a reinforcement grid insideIllustrative
  5. 05

    Pour & finish

    Poured, leveled, and finished to your choice, broom or stamped, by the same crew that prepped it.

    Freshly poured concrete leveled inside the formsIllustrative
  6. 06

    Cure

    Cured properly before it takes furniture and foot traffic.

    Finished broom-textured concrete with control jointsIllustrative

One crew from the first shovel to the first cookout.

The standard

Four numbers behind a patio that lasts.

General guidance from concrete industry and code sources. Ask any contractor for theirs.

1/8 in.

Slope per foot

The minimum pitch away from the house, so rain runs off instead of toward your foundation.

10 ft

Joint spacing

Control joints about every 10 ft on a 4 in. slab, cut a quarter of the depth, so cracks form where they're planned.

5–7%

Air entrainment

Tiny air pockets that give freeze-thaw somewhere to go. Standard for outdoor concrete in Illinois.

Source: PACA

48 in.

Pool barrier

The pool code many Illinois towns adopt sets barriers at least 48 in. high. The deck layout has to leave room for it.

Recent work

Patios we've poured.

Real projects from Joliet and Chicagoland.

After the pour

Keep it looking new.

No deicers this winter

None in the first year, and never ammonium nitrate or ammonium sulfate. Use sand for traction.

Source: PACA

Seal it

Penetrating silane or siloxane sealers hold up best against salt and freeze-thaw.

Source: PACA

Keep water moving

Point downspouts off the slab and keep soil graded below its edge, so water keeps running away from the house.

Those lines are on purpose

Control joints guide cracking, so a crack in a joint means the plan is working.

FAQ

Patio and pool deck questions, answered.

815-836-1828

7 days a week

  • Yes. Installing, replacing, or adding to a patio, with or without a roof, needs a permit with an accurate plat of survey. Other towns set their own rules.

Get started

Let's build your patio.

Request a free quote and we'll measure the space, check drainage, and walk you through finishes and timeline. Prefer to talk? Call 815-836-1828, 7 days a week.

Free quotes, 7 days a week.

Serving Greater Chicagoland

7 days a week