Foundations, built right before they're buried.

Concrete foundations across Joliet and Chicagoland, poured level and square by one crew. In Joliet, the city inspects them before any concrete goes in.

Covers
Footings · Foundation walls
Inspections
Joliet inspects footings and walls before they're poured.
Backfill
Walls wait at least 10 days before backfilling.

What's included

Two parts. One foundation.

The pieces that carry everything built on top.

Footings

The base of the foundation, set on undisturbed soil and below the local frost line.

Foundation walls

Poured concrete walls, braced as needed and given at least 10 days before backfilling.

Joliet's rules

Every part has its own rule.

The City of Joliet sets cold-weather and inspection rules for each part of the job. Here they are side by side.

Footings

Minimum air temperature
10°F and rising
Keep the concrete at
50°F until it reaches 500 psi, usually 2 days
Inspected
After digging, before the pour

Foundation walls

Minimum air temperature
15°F and rising
Keep the concrete at
55°F for at least 5 days
Inspected
Before the pour

Flatwork

Minimum air temperature
32°F and rising
Keep the concrete at
55°F for at least 5 days
Inspected
As listed on your permit

Sources: City of Joliet

As published by the City of Joliet. Other towns set their own rules.

How we build it

Dug, checked, poured, cured.

A foundation gets one chance to be right. Here's the order, including where the city steps in.

  1. 01

    Dig to depth

    Footings go on undisturbed soil or engineered fill, below the local frost line.

  2. 02

    Footing inspection

    In Joliet, the city inspects the footings after they're dug and before they're poured.

  3. 03

    Pour the footings

    In cold weather, footings are kept at 50°F until they reach 500 psi.

  4. 04

    Form the walls

    Wall forms go up on the footings, and in Joliet the walls are inspected before they're poured.

  5. 05

    Pour & cure the walls

    Poured by the same crew and, in cold weather, kept at 55°F for at least 5 days.

  6. 06

    Wait, then backfill

    Walls get at least 10 days before backfilling, braced as needed.

One crew from the first dig to the last pour.

The standard

The minimums a foundation starts from.

From the residential code, the City of Joliet, and NRMCA. Good work starts at these numbers.

12 × 6 in.

Footing size

The residential code's smallest footing: at least 12 in. wide and 6 in. thick.

12 in.

Minimum depth

Footings sit at least 12 in. below the ground, and below the local frost line.

500 psi

Freeze protection

New concrete is protected from freezing until it reaches 500 psi.

Source: NRMCA

10 days

Before backfill

Joliet requires foundation walls to cure at least 10 days before backfilling.

Plan ahead

Plan around the weather.

Book before the cold

Cold weather means days averaging below 40°F for more than three days in a row. Concrete poured then needs protection.

Source: NRMCA

Plan for inspections

Joliet inspects footings and walls before each pour, so build those visits into the schedule.

Ask about registration

Joliet requires every contractor to be registered with the city before a permit is issued.

Keep water moving

Point downspouts and grade soil away from the new foundation.

FAQ

Foundation questions, answered.

815-836-1828

7 days a week

  • Below the frost line set by the local code, and at least 12 in. below the ground. Your permit confirms the exact depth.

Get started

Let's start from the ground up.

Request a free quote and we'll look at the site, the plans, and the schedule, including what the season allows. Prefer to talk? Call 815-836-1828, 7 days a week.